Showing 1–20 of 40 results

  • PED 1

    PED 1-Basic Modern Entry Door

    0 out of 5
    $3,390

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 12 -Modern front door

    PED 12 -Modern front door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 12C -Contemporary exterior door

    PED 12C -Contemporary exterior door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 13 -external solid front door

    PED 13 -external solid front door

    0 out of 5
    $3,390

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 14 -simple front door

    PED 14 -simple front door

    0 out of 5
    $3,390

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 21 -Premium insulated steel entry system

    PED 21 -Premium insulated steel entry system

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 23A -High-end custom steel entry door

    PED 23A -High-end custom steel entry door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 24

    PED 24 -Modern insulated steel entry door with decorative glass insert

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 25 -House front door

    PED 25 -House front door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 25B -Custom exterior  door

    PED 25B -Custom exterior door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 25C -Custom exterior steel door

    PED 25C -Custom exterior steel door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 26C

    PED 26C -Executive steel entry door system

    0 out of 5
    $3,390

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 26D -Modern insulated steel entry door

    PED 26D -Modern insulated steel entry door

    0 out of 5
    $3,390

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 26G - exterior entry door

    PED 26G – exterior entry door

    0 out of 5
    $3,390

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 26H -Modern insulated steel entry doorPED 26H

    PED 26H -Modern insulated steel entry door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 26K -secure stainless steel door (Copy)

    PED 26K -secure stainless steel door (Copy)

    0 out of 5
    $3,490

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 30 -Secure steel front door

    PED 30 -Secure steel front door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 30B -Custom size exterior door

    PED 30B -Custom size exterior door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 31A

    PED 31A -Modern luxury door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

  • PED 36PED 36

    PED 36 -Custom contemporary steel door

    0 out of 5
    $3,455

    Doors are manufactured after the order has been placed through the website. Production time for our doors takes up to 8-12 weeks. Construction: The door is made of stainless steel. Inside it is filled with PUR polyurethane foam and wood. The thickness of the door slab is 2.5 inch. Dual sealing system – one seal…

End of contentWe have more options available in our catalog! View Our Metal Doors Catalog

End of content